Basic operating performance of each toll highway

Toll highway
Percentage of interests held by the Group Percentage of revenue consolidated
Average daily mixed traffic volume(number of vehicles in thousands)
Average daily toll revenue(RMB’000)
2009
Change as compared to 2008
2009
Change as compared to 2008
Shenzhen Region:
  Meiguan Expressway
100%
100%
98
6.0%
814
2.8%  
  Jihe East 1
100%
100%
73
7.6%
951
1.5%  
Jihe West
100%
100%
93
2.2%
1,242
1.2%  
Yanpai Expressway
100%
100%
34
5.8%
383
-6.0%  
Yanba Expressway
100%
100%
17
19.0%
213
9.1%  
  Nanguang Expressway 2
100%
100%
32
97.2%
302
72.1%  
Shuiguan Expressway
40%
-
118
11.1%
1,072
6.6%  
  Shuiguan Extension
40%
-
32
14.6%
203
13.2%  
Other Regions in GuangdongProvince:
  Yangmao Expressway
25%
-
20
8.3%
968
7.2%  
  Guangwu Project
30%
-
11
14.1%
306
15.4%  
  Jiangzhong Project
25%
-
51
12.3%
707
8.5%  
  GZ W2 Expressway
25%
-
15
55.4%
471
56.2%  
  Qinglian Project 3
76.37%
100%
16
NA
930
NA  
 中國其他省份︰
  Wuhuang Expressway
55%
-
32
11.2%
1,090
7.2%  
  Changsha Ring Road
51%
-
7
22.0%
64
5.0%  
  Nanjing Third Bridge
25%
-
20
9.2%
672
5.0%  

   1   Since 30 September 2009, the percentage of interests in Jihe East held by the Group has increased from 55% to 100%.

   2   The main route of Nanguang Expressway was opened to traffic in January 2008.

   3   The main route of Qinglian started to toll as expressway since 1 July 2009. As the original toll model of Qinglian Project differs from the toll model of expressways in terms of the toll rate, vehicle category and statistical method, the statistics of the year-on-year changes of Qinglian Expressway are not provided. The statistics in the table only represent the operational statistics of Qinglian Expressway after opening to traffic excluding the operational statistics of Liannan Section and Class 2 Road of Qinglian Company, which are still tolled in accordance with the standard of Class 1 highway. In 2009, the overall average daily toll revenue of Qinglian Company was approximately RMB663,000, of which RMB458,000 was from the first half of the year and RMB867,000 was from the second half of the year.   




  
版權所有︰深圳高速公路股份有限公司
Copyright @ 2005 Sz-expressway.com. All Rights Reserved

Warning: Unknown: write failed: No space left on device (28) in Unknown on line 0

Warning: Unknown: Failed to write session data (files). Please verify that the current setting of session.save_path is correct () in Unknown on line 0