The toll highway projects, which were operated and invested in by the Group, located in Shenzhen City, other areas of Guangdong Province and other provinces in the PRC.
Projects operated and invested by the group
| Toll Highways |
Locations |
Length(km) |
interests hold |
No. of Lane(s) |
Status |
Operation Period |
| Meiguan Expressway |
Shenzhen |
19.3 |
100% |
6/4 |
Operation/ Extension |
1995.05-2027.03 |
| Jihe East |
Shenzhen |
23.9 |
55% |
6 |
Operation |
1997.10-2027.03 |
| Jihe West |
Shenzhen |
21.7 |
100% |
6 |
Operation |
1999.05-2027.03 |
| Yanba Expressway |
Shenzhen |
29.1 |
100% |
6 |
Operation |
2001.04-2031.03 |
| Shuiguan Expressway |
Shenzhen |
20.1 |
40% |
6 |
Operation/ Extension |
2002.02-2025.12 |
| Shuiguan Extension |
Shenzhen |
5.2 |
40% |
6 |
Operation |
2005.10-2025.12 |
| Yanpai Expressway |
Shenzhen |
15.2 |
100% |
6 |
Operation |
2006.05-2027.03 |
| Nanguang Expressway |
Guangdong |
33.1 |
100% |
6 |
Operation |
2008.01-2033.01 |
| Yangmao Expressway |
Guangdong |
79.7 |
25% |
4 |
Operation |
2004.11-2027.07 |
| Guangwu Project |
Guangdong |
39.8 |
30% |
4 |
Operation |
2004.12-2027.11 |
| Jiangzhong Project |
Guangdong |
37.5 |
25% |
4 |
Operation |
2005.11-2027.08 |
| GZ W2 Expressway |
Guangdong |
42.0 |
25% |
4 |
Operation |
Applying for approval |
Qinglian Expressway |
Guangdong |
188/27 |
76.37% |
4 |
Operation/ Reconstruction |
2009.07-2034.07 |
| Wuhuang Expressway |
Hubei |
70.3 |
55% |
4 |
Operation |
1997.09-2022.09 |
| Changsha Ring Road |
Hunan |
34.5 |
51% |
4 |
Operation |
1999.11-2029.12 |
| Nanjing Third Bridge |
Jiangsu |
15.6 |
25% |
6 |
Operation |
2005.10-2035.10 |
|
Note: With the same number of lanes, the differences in design standards such as design speed and surface quality may cause differences in capacity. Generally, the capacity of a four-lane expressway is approximately 100,000 passenger car unit per day while the capacity of a six-lane expressway is approximately 120,000 passenger car unit per day. |